A small trial order checklist
What a first order should test, and which costs are unavoidable at low volume.
ReadSourcing Guides
Most sourcing disputes do not begin with a bad factory. They begin with a description that two people read differently. "Strong tow strap, 5 metres" is not a specification — it is a starting point for an argument about webbing width, stitching, hook type and whether the load rating refers to working load or breaking strength.
The method below turns a description into a document that production can be held to, and that an inspector can measure against. It has six parts, and skipping any one of them leaves a gap that shows up at the worst possible moment.
Name the material, not the category. "Plastic housing" and "ABS housing with UV stabiliser" are different products with different costs, and one of them will fade on a dashboard in a warm climate.
This is where most automotive specifications fail. A number without a condition is not measurable. Peak current at what temperature? Load rating measured on new webbing or after cycling? Pressure rating at which temperature?
| Weak | Strong |
|---|---|
| High capacity jump starter | Peak 1000 A, cranking 400 A at −18 °C, measured on a fresh charge per the agreed test method |
| Heavy duty tow strap | Working load 5 t, breaking strength 15 t, 50 mm webbing, label states working load only |
| Fits most phones | Accepts devices 55–90 mm wide, 6–12 mm thick, mounting by 17 mm ball joint |
| Waterproof | Rated to the stated ingress protection level, with the level written on the product label |
State the measurement method too. If a dimension is checked with a calliper at a defined point, say so; if a rating comes from a type test rather than a batch test, say which.
Appearance disputes are common on interior accessories because the reference is a photograph. Use a physical sample or a colour code, and state how much batch variation is acceptable before the order starts rather than after the second container arrives.
Everything in the box gets a line. This is the single most under-specified part of automotive orders, and the part your customer notices first. Whether the clamps are fused, whether a carry case is included, whether the instruction sheet is in the destination language — each one changes whether the unit can be resold as received.
Packaging is a cost and a lead-time driver, and it is decided before print. Retail colour box, neutral box or poly bag; barcode symbology and number; label text; units per inner and per carton; carton dimensions and gross weight.
Carton data is not paperwork — it feeds your freight calculation and your warehouse slotting. Getting it wrong is discovered at the loading bay, when changing it is expensive.
The specification is only enforceable if something checks it. Agree the sampling basis, what counts as a critical, major and minor defect for this item, and what happens to non-conforming units before shipment.
A scratch is a major defect on a visible interior panel and a minor one on a hidden mounting bracket. The classification has to be written per item, not copied from a template.
The reply you get back tells you a lot. A supplier who returns a numbered list of open questions is reading the document. One who replies with a price and no questions is quoting something, but not necessarily your product.
Once the specification is settled, the next constraint is usually volume and cost structure. The companion guide on small trial orders covers what a first order should test and which costs are unavoidable at low volume. If packaging is still open, retail-ready vs neutral packaging compares the two paths directly.
Our own process for agreeing a specification is described on the Sourcing & Supply page, and the inspection terms in part six are set out in more detail under Quality & Compliance.
About this guide. Written by the Splinktech sourcing team from points that recur in buyer inquiries across roadside, tire maintenance and vehicle accessory ranges. It describes a method, not a claim about any specific product's performance. Product-specific figures are confirmed per order in writing.
Treat it as a draft and rewrite it in your own order: material, construction, dimensions, ratings with test conditions, finish, accessories, packaging, inspection. If a field cannot be filled from what you were sent, the sheet is not yet approved, and shipping against it moves the risk to you.
A rating without its test condition is not a specification. Write the value, the unit, and how it is measured or under what condition it applies, so that an inspection can reproduce the same result rather than comparing a claim against an opinion.
Yes. Packaging is where the cost and lead-time surprises live, and it belongs in the same document as the product, because a change to the packaging after the specification is approved is a change to the order and should be treated as one.
Include quantity and destination market. The reply lists what is feasible, what needs deciding, and what a trial would look like.